2016 to Present

January 1, 2016 to July 10, 2016:  267 Hrs - Firewall Al Chute Straps Milled, Skim Coat Underside Strakes & Fuselage Sides, Port Riser Valley Cut, Riser Foam Covered & Glassed (3 BID), Glass (17 BID) Inside Firewall Flanges, Finish Glassing Carbon Tube (17 BID) Front Seat Back

Construction History:

2015 -  526.0 Hrs - Headrest cutout of fuselage; carbon tube and flange boxes installed and glassed in (17 BID); Riser Valley; Skim coat top Strake

2014 - 120 Hrs - LEXAN IP Template transferred to cockpit IP.  Buy BRS Parachute

Instrument Panel Assembly

Instrument Panel Assembly

2013 -

2012 -

2011 -

2010 -

2009 -

2008 -

2007 - 4.0 Hrs - Landing Light & Panel Layout

2006 -

2005 -

2004 - 0.0 Hrs

2003 - 36.5 Hrs - Canard Cover & Fire Wall Engine Mounts  (Zaugg Resort - July 27 + Spaceship 1 at Oshkosh)

2002 - ? Hrs - Chart Calendar smudged beyond recognition?

2001 -

2000 - 87.0 Hrs - Brakes & Lycoming Engine  (RJS)

1999 - 107 Hrs - Port & Starboard Strakes (Fuel & Baggage) (CLS & END)

1998 -

1997 -

1996 - 120.5 Hrs - Craig helped with Port & Starboard Winglet/ Rudder fabrication.

1995 -

1994 -

1993 -

1992 - 16.0 Hrs -  Glass & Knife Trim Canopy  (JMS & Al Townsend)

1991 -

1990 -

1989 -

1988 - 15.2 Hrs - Fabricate Canopy Hard Points  (Disney World - April 5 through April 8)

1987 -

1986 - 9.0 Hrs - Pour Foam Canopy (April 23 start 21 Day Stryker Fst)

1985 - 64.3 Hrs - Green Foam Canopy & Cut off of Fuselage, Fab Rudders, COM Antenna                               (JMS)

1984 - 191.1 - Roll & Pitch Trim, Control Stick & System, Spar Fabricated & Mounted, Canopy Mounted to Fuselage 

1983 - 493.9 Hrs -  Glass Port Wing, Winglet, COM Antenna, Port and Starboard Ailerons. Fabricate & Mount Fuselage Control System, Pitot Tube Htr. & Firewall   (Ryan Born Aug 4)

1982 - 181.4 Hrs - Carve Landing Light in Nose, Glass Starboard Wing and Winglet & Install COM Antenna. (JMS & RAS)

1981 -  389.5 Hrs - Main Gear, Nose Gear, Speed Brake, Wing Cores Hot Wired, Nose Sculpted & Pitot Tube Instld, Canopy, Moved Fuselage to Attached Garage (Duke) (Mark Born Jan 27)

1980 - 373.0 Hrs - Finish Rear Wings. Fabricate Fuselage Bulkheads, Seats, Sides and Glass. Fabricate Spar.

1979 - 29.95 Hrs - Rear Wings: Fabricate plywood wing jigs.

1978 - 424.00 Hrs. - Purchase LongEZ Plans at OshKosh. VariEZE Canard interchangeable with LongEZ canard, after trimming 2 inches off both ends. Fabricate masonite rear wing templates. Hot wire cores. Cut cores. Layup wing spars. Jig leading and trailing edge cores together and glass outside surfaces with 3 layers BID. Cut out ailerons. (Ericka born Oct 8)

1977 - 142.5 Hrs - Canard Fabricated

1976 - 96.5 Hrs - Buy VariEZE plans at OshKosh. Clean basement. Build table. Read plans. (Craig born October 27)

Initial Construction

Burt Rutan & Mike Melville demonstrating basic construction techniques of laying up hot wired foam cores:


August 1976 - Long Table Constructed for creating our Canard, Wing and Fuselage 

Wing Jig Table built straight & level was first major project of building our plane.  Craig was born in October of 1976; and the reason that we purchased our home at 2424 E 91st.

Oshkosh 1976 - Burt Rutan's VariEZE introduction!

Oshkosh 1976 - Burt Rutan's VariEZE introduction!

RutanVariEze2-1975.jpg

I purchased VariEZE plans during my visit to EAA's Oshkosh Home-built Aircraft Convention in July of 1976; and proceeded to build the canard.  In 1978 I upgraded to LongEZ plans because the LongEZ was longer, wider and a better cross-country plane than the the VariEZE.  Fortunately, by trimming a couple inches off of each end of my, already built VariEZE canard, it became interchangeable with the new LongEZ canard!